Our optimization study and benchmarks (all numbers are exact solver runs not surrogate prediction)
Volve field · 9 wells · 5 control intervals · 680,400 grid cells
Our best plan
$533.1M
NPV in OPM Flow, +7.3 % vs Everest
Everest's best
$496.9M
NPV in OPM Flow
Try your plan
Start from one of the plans, change any control, and press Predict.
Units: Minimum BHP in bar · Water injection rate in Sm³/day.
Start from: Best plan foundEverest's bestStart plan of the 41 Flow runs within 3 % of our best NPV
The table has changed. Press Predict to update these results.
| Objective | This plan (surrogate) | Our best plan (validated) | vs our best plan |
|---|---|---|---|
| NPVmillion USD, higher is better | 496 ± 18 | 533 | -5.8 %, worse |
| Oil producedmillion Sm³, higher is better | 1.944 ± 0.061 | 2.008 | -2.5 %, within the error |
| Gas producedbillion Sm³, lower is better | 0.261 ± 0.008 | 0.265 | +0.7 %, within the error |
| Water producedmillion Sm³, lower is better | 15.4 ± 1.6 | 13.8 | +8.3 %, within the error |
| Water injectedmillion Sm³, lower is better | 17.5 ± 1.7 | 15.9 | +7.3 %, within the error |
| Water breakthroughmonths, higher is better | 25.2 ± 1.9 | 24.0 | +9.2 %, better |
| Energy useGWh, lower is better | 103.9 ± 10.0 | 94.8 | +4.9 %, within the error |
| Energy per unit of oilkWh per Sm³, lower is better | 53.1 ± 5.4 | 47.2 | +10.7 %, within the error |
Field rates, month by month
This planOur best planboth predicted